STARCHASER ENGINES GALLERY    
Click an image to view the gallery (There are more movies in the Members area)    
HYBRID TEST ENGINE PICTURE GALLERY    
Hybrid Test Engine Picture Gallery

Further tests of our new Hybrid Test Engine were conducted in September 2007. A picture gallery of the thruster test is here, a video of a test is also available in the Team Starchaser Club area of our website.
   
HTP FIRST DISTILLATION    
HTP First Distillation

For the past few months work we have concentrated on completing a Hydrogen Peroxide processing facility. On 27 July 2007 Starchaser propulsion engineers started the first distillation process following completion of the equipment required.
A small picture gallery has been created of this.
   
PREPERATIONS FOR STORM TEST FIRING    
Preparations for STORM test firing

A small gallery of pictures from the preparations for the test firing of the STORM engine at RAF Spadeadam are here. More pictures are available in the Team starchaser Members Area.
   
STORM THRUST FRAME INSTALLATION    
Storm Thrust Frame Installation

The Storm engine thrust frame was installed at the UK test site in early 2006.The quality and precision of the engineering the installation was completed in less than half a day.
   
STORM THRUST FRAME CONSTRUCTION    
Storm Thrust Frame Construction

In early 2006 the design and construction of the thrust frame needed for testing of the Storm Engine was completed. When the Storm engine was test fitted to the frame it fitted perfectly.
   
STARCHASER ACTIVITIES MARCH-APRIL 2006    
Starchaser Activities March-April 2006

During March and April 2006 the Starchaser Factory hummed with activity. This is a gallery containing some of the pictures taken.
   
CHURCHILL MK 2    
Churchill MK 2

The Churchill Mk 2 bi-liquid rocket engine developed 3 tonnes of thrust. During the 7 static test firings it provided crucial data for the design of the Mk 3 engine.
   
LES (Launch Escape System)    
LES (Launch Escape System)

Starchaser are developing a Launch Escape System (LES) to safeguard the lives of their astronauts during all phases of powered ascent. The LES will therefore protect the crew from a variety of emergency scenarios befalling the Starchaser 5 rocket booster.
   